ben-tilley@pc-razer2:~$ cat /vault/theatre/shw-westbound.md 44 nodes · 47 assets

Westbound [shw-westbound]

Year: 2026 (MT26) Venue: The North Wall Arts Centre Company: Splinters Roles: Lighting Designer Systems: ETC Eos, Python CAD Rig Plotting upcoming

Traverse split-stage design at The North Wall opposing clinical night hospital and daylight domestic spheres across a chalk-outlined LED threshold.

3 sections · node [shw-westbound]
§1Dramaturgy & Spatial Concept

A two-timeline play ("Today" vs "2014-ish") staged in Traverse between two opposing Nivoflex audience banks at The North Wall Arts Centre.

  • Split Playing Corridor:
    • Space A — Hospital (Night): Cold, clinical overhead fluorescent wash and stark nocturnal isolation.
    • Space B — Bedroom (Day): Window gobo beams entering from the end-traverse window flats, shifting angle and colour temperature across morning, afternoon, and dusk alongside an actor-motivated bedside practical lamp.
  • Central Threshold & Chalk Blueprint:
    • During pre-set, actors draw three overlapping house ground plans in chalk across the black Nivoflex deck, flanked by a chalk doorframe outlined with low-voltage LED strip markers.
    • Steep overhead/side grazing angles illuminate the chalk floor drawings without flaring into opposing audience rows.
  • The "Mother" State: A dedicated cross-space atmospheric backlight treatment representing the offstage mother ("always illuminating").
§2Control & Venue Stock Integration
  • Desk & Dimming: ETC Ion (2x10 wing) driving 96x ETC Thru-Power ways (enabling both dimmed practicals and hard-switched LED PSUs).
  • Planned Fixture Mix: ETC ColorSource Zooms (8x) and Deep Blue ColorSource PARs (18x) for traverse cross-wash without audience glare; Source 4 Zoom / 26° profiles for crisp window shutter cuts; Selecon Acclaim Fresnels (14x) for clinical overhead hospital boxes.
§3Rig Plot & Production Paperwork
Westbound_Thrust_Rig_Plan.png
Embed: Westbound_Thrust_Rig_Plan.png (1.18 MB) Open raw image ↗
Westbound_Clive_Meeting_Checklist_p1.png
Embed: Westbound_Clive_Meeting_Checklist_p1.png (279.5 KB) Open raw image ↗
Westbound_Clive_Meeting_Checklist_p2.png
Embed: Westbound_Clive_Meeting_Checklist_p2.png (228.2 KB) Open raw image ↗
PXL_20261116_134011067.MP.jpg
Embed: PXL_20261116_134011067.MP.jpg (5.96 MB) Open raw image ↗
PXL_20261116_134019169.MP.jpg
Embed: PXL_20261116_134019169.MP.jpg (4.86 MB) Open raw image ↗